here we go. Planning for my future track goes on and I would like to ask you about your opinion and your thoughts about it.
Estimated size is arround 6m x 1,5m and it might look like this:

Traveldirection will be beginning with LC1 anticlockwise. 'LC' is for Lanechange, 'BL' is Bestlane, 'Ext' is the area were future extensions might be added, further more the left and right end of the track might be interchanged here.
I am not sure if LC6 and LC9 are really necessary or if BL1 better should be made as a lanechange?!
What do you think?
What might happen at LC2 and LC8 when not steered? Are cars going to change lane here automatically?
Track has to be made modular for better transport and stowing away out of the garden into the basement when not in action.
The area between LC6 and LC8 is thought to be made as a bridge without space for sliding; is that pracical with Magracing? Rest of the track is going to have slidingareas of about 20 to 30cm each side of the track (see grey marked areas on the photo). Will that be enough?
I am looking fwd for your input. Thank you.
Regards Jens